Prairieville Middle School Major Renovations & Additions

The Prairieville Middle School project represents a comprehensive renovation and expansion of the existing campus, thoughtfully designed to support continued growth while preserving key existing facilities. The original gymnasium, band building, and two classroom buildings were maintained and integrated into the overall master plan.

A new two-story academic building anchors the campus, featuring 34 classrooms, a centralized administrative suite, and a modern library/media center designed to enhance both learning and collaboration.

To support student life and large gatherings, a new cafetorium and kitchen were added, accommodating 600 students in a dining configuration and up to 900 with auditorium-style seating. Adjacent to the existing gymnasium, a new 800-seat gymnasium was constructed, complete with expanded restroom and locker facilities, as well as a dedicated concession area.

The completed project delivers a cohesive, high-functioning campus that balances new construction with existing structures, creating an environment that supports both academic excellence and student engagement.

Client

Ascension Parish School Board

Location

Prairieville, Louisiana

Size

120,000
Sq. Ft.

Completion Date

Spring 2014

Project Cost

$13,082,000

precision

functionality

Creativity

Project Overview

This project showcases a harmonious blend of innovation and functionality, tailored to meet the specific needs of the owner. Located in a vibrant community, the design reflects the local culture while providing a modern touch that enhances the user experience.

The site was carefully selected to optimize natural light and views, ensuring that every space feels connected to the outdoors. With a total area of 3,500 square feet, the layout promotes both collaboration and privacy, making it ideal for various activities.

Completed in June 2023, this project was executed with precision and attention to detail. Our dedicated contractor worked closely with our design team to bring the vision to life, adhering to the highest standards of quality throughout the construction process.

The project budget was set at $1.2 million, with the final cost coming in slightly under budget, demonstrating our commitment to efficient resource management. This allowed for the inclusion of high-quality materials and finishes that elevate the overall aesthetic.

Overall, this project not only meets the functional requirements but also serves as a testament to what can be achieved through thoughtful design and collaboration. We are proud to have played a role in creating a space that will be cherished for years to come.

No items found.

Let’s Build Something Amazing

We’d love to work with you to create a space that perfectly suits your needs. Contact Gasaway Gasaway Bankston today to get started.

Thank you! We will respond shortly.
Oops! Please check your submission and try again.