Live Oak Jr. High School -Renovations

As part of a broader campus renovation, our team was commissioned by the Livingston Parish School Board (LPSB) and the Louisiana Governor’s Office of Homeland Security and Emergency Preparedness (LOHSEP) through a cooperative endeavor agreement to transform the existing Main and Auxiliary Gymnasiums into a certified first responder hurricane shelter.

The facility was upgraded to meet FEMA 361 standards for storm protection. Enhancements included the installation of impact-resistant screens over windows and doors, structural roof reinforcements engineered to withstand hurricane-force winds, and the addition of a new cooling and ventilation system designed to support emergency shelter operations. A generator was installed to provide reliable backup power for both gymnasiums during critical events.

In addition to life-safety improvements, the project included comprehensive interior renovations. New basketball goals were installed, the Auxiliary Gym received new epoxy flooring, and the Main Gym floor was refinished. Locker areas were refurbished, new restrooms were constructed, and a concession stand was added to better serve students and the community.

This project reflects our commitment to designing facilities that not only enhance daily student life but also serve as resilient, community-focused infrastructure in times of need.

Client

Livingston Parish School System

Location

Watson, Louisiana

Size

107,000
Sq. Ft.

Completion Date

August, 2015

Project Cost

$1,278,180

precision

functionality

Creativity

Project Overview

This project showcases a harmonious blend of innovation and functionality, tailored to meet the specific needs of the owner. Located in a vibrant community, the design reflects the local culture while providing a modern touch that enhances the user experience.

The site was carefully selected to optimize natural light and views, ensuring that every space feels connected to the outdoors. With a total area of 3,500 square feet, the layout promotes both collaboration and privacy, making it ideal for various activities.

Completed in June 2023, this project was executed with precision and attention to detail. Our dedicated contractor worked closely with our design team to bring the vision to life, adhering to the highest standards of quality throughout the construction process.

The project budget was set at $1.2 million, with the final cost coming in slightly under budget, demonstrating our commitment to efficient resource management. This allowed for the inclusion of high-quality materials and finishes that elevate the overall aesthetic.

Overall, this project not only meets the functional requirements but also serves as a testament to what can be achieved through thoughtful design and collaboration. We are proud to have played a role in creating a space that will be cherished for years to come.

No items found.

Let’s Build Something Amazing

We’d love to work with you to create a space that perfectly suits your needs. Contact Gasaway Gasaway Bankston today to get started.

Thank you! We will respond shortly.
Oops! Please check your submission and try again.